variable run time

Message boards : Number crunching : variable run time

To post messages, you must log in.

AuthorMessage
Profile Greg_BE
Avatar

Send message
Joined: 30 May 06
Posts: 5658
Credit: 5,670,291
RAC: 2,328
Message 51135 - Posted: 2 Feb 2008, 18:04:08 UTC

I saw a post about the twisty units getting better results if you ran them at 6 hours vs 4 hours.

I ran the batch I had at 6 hours but then that set my other work behind schedule and even with setting things back to 4 hours I ran behind schedule and then I aborted the past the deadline work because I figured I would not get any credit for it.

Now, if my normal base run time is 4 hours and then I set it for 6 hours to get good results on specific work and then set the run time to 2 hours to catch back up on deadline and then set the run time back to 4 hours how is this going to affect the credit and the science result?
ID: 51135 · Rating: 0 · rate: Rate + / Rate - Report as offensive    Reply Quote
Profile Keck_Komputers
Avatar

Send message
Joined: 17 Sep 05
Posts: 211
Credit: 4,246,150
RAC: 0
Message 51144 - Posted: 3 Feb 2008, 1:14:22 UTC

Each time you change the run time setting it will confuse the scheduler on your hosts. I would advise setting it to the longer time and leaving it there.
BOINC WIKI

BOINCing since 2002/12/8
ID: 51144 · Rating: 0 · rate: Rate + / Rate - Report as offensive    Reply Quote
Mod.Sense
Volunteer moderator

Send message
Joined: 22 Aug 06
Posts: 4018
Credit: 0
RAC: 0
Message 51146 - Posted: 3 Feb 2008, 2:17:54 UTC

The science is uneffected either way. The recent questions have been more related to tasks that require a higher then normal minimum to complete a single model. Some taking more then 6 hours to complete a single model, which is the minimum amount of useful work. And so if you set your preference to 6 hours, it causes these tasks to complete in roughly the time you expect. The same task, run by a machine with a 2hour runtime preference is still going to take the 6 hours to complete, and hence not be completed in the time expected.

Yes, changes in target runtime effect the tasks you already have downloaded, and can confuse the scheduler (and possibly aid in meeting deadlines).

In general, when adjusting runtime preference, make changes gradually. And make changes when you do not have a large backlog of work downloaded. BOINC just knows how long the last task took. It really knows nothing about how long any uncompleted tasks will take.
Rosetta Moderator: Mod.Sense
ID: 51146 · Rating: 0 · rate: Rate + / Rate - Report as offensive    Reply Quote

Message boards : Number crunching : variable run time



©2024 University of Washington
https://www.bakerlab.org