when I stop rosetta and boinc, with a 'suspend' and then
exiting boinc to burn dvd's or something - most often when I restart boinc and rosetta after I'm done with the other task the work is terminated, results are sent (always short of the normal run time to completion) and
new work units are started. This is with w2k, rosetta
5.59, boinc 5.8.16. I'm wondering how these work units
can be credited when they get 'terminated' and results
sent when they often are less than 1/2 completed. And why they don't continue from where they were stopped so they can finish normally???



ID: 40020 · Rating: 0 · rate: Rate + / Rate - Report as offensive    Reply Quote
Mod.Sense
Volunteer moderator

Send message
Joined: 22 Aug 06
Posts: 4018
Credit: 0
RAC: 0
Message 40153 - Posted: 1 May 2007, 16:26:00 UTC

Work units are made up of models. So, even if the work unit has not reached the target runtime, it has often completed several useful models. These are reported back and given credit, even if the current model that was in progress does not complete normally.
Rosetta Moderator: Mod.Sense
ID: 40153 · Rating: 0 · rate: Rate + / Rate - Report as offensive    Reply Quote

Questions and Answers : Windows : work unit terminated



©2024 University of Washington
https://www.bakerlab.org