Remaining time for tasks is incorrect

Message boards : Number crunching : Remaining time for tasks is incorrect

To post messages, you must log in.

AuthorMessage
Profile dgnuff
Avatar

Send message
Joined: 1 Nov 05
Posts: 350
Credit: 24,773,605
RAC: 0
Message 93937 - Posted: 9 Apr 2020, 1:52:42 UTC

I have my project preferences set to run tasks for 24 hours, in an attempt to reduce the load on the servers.

WU do generally run for the full 24 hours, but just after they've been downloaded, the remaining time shows as a much shorter time: I have some showing as low as 2H 22M. The problem this leads to is that the scheduler WAY overcommits and downloads far more WU tghan I can actually get done. Tis leads to either missed deadlines, or me having abort significan't numbers of tasks.

Any suggestions for how I can fix this? Taking it to Boinc's website is an option, but I figured I'd ask here first, since it is a Rosetta specific setting not being respected that's at the heart of the problem.

TIA for any help.
ID: 93937 · Rating: 0 · rate: Rate + / Rate - Report as offensive    Reply Quote
Profile Grant (SSSF)

Send message
Joined: 28 Mar 20
Posts: 1491
Credit: 14,677,518
RAC: 14,569
Message 93938 - Posted: 9 Apr 2020, 2:17:42 UTC - in response to Message 93937.  

With your computers hidden it makes it difficult, but new applications recently released, and a recent batch of bad Tasks will have made a mess of existing Estimated time estimates. Once a dozen or two Tasks have been completed, the Estimates will end up being pretty close to the the actual Target CPU runtime again.

By have a small cache "Store at least 1 days of work" (or less) and "Store up to an additional 0.02 days of work" it will reduce the impact of new applications and dodgy Tasks re-setting Estimated times. and stop your system from becoming swamped with more than it can handle.
Grant
Darwin NT
ID: 93938 · Rating: 0 · rate: Rate + / Rate - Report as offensive    Reply Quote
Mod.Sense
Volunteer moderator

Send message
Joined: 22 Aug 06
Posts: 4018
Credit: 0
RAC: 0
Message 93990 - Posted: 9 Apr 2020, 18:41:52 UTC

Sounds like perhaps you machine caught a bunch of those that were failing immediately. Either set small work cache, or reduce your runtime pref. to a level where you can get the work done, and then ratchet it back up to 24hrs. The change to the runtime preference (for the right venue of the machine) will take effect to the current pending work.
Rosetta Moderator: Mod.Sense
ID: 93990 · Rating: 0 · rate: Rate + / Rate - Report as offensive    Reply Quote
Profile dgnuff
Avatar

Send message
Joined: 1 Nov 05
Posts: 350
Credit: 24,773,605
RAC: 0
Message 94047 - Posted: 10 Apr 2020, 9:31:37 UTC - in response to Message 93990.  

Yeah, I suspect that's what happened. I finally reset the project, and straightaway, it started showing 24 hours for the expected run times, and downloading an appropriate number of WU.

Glad to have it all sorted out now. Onward, with crunching for Rosetta and COVID-19.
ID: 94047 · Rating: 0 · rate: Rate + / Rate - Report as offensive    Reply Quote

Message boards : Number crunching : Remaining time for tasks is incorrect



©2024 University of Washington
https://www.bakerlab.org