Posts by wiltonbro

1) Message boards : Technical News : Due to user feedback and an attempt to reduce the load on our servers, we increased the default target run time from 3 to 6 hours, increased job deadlines to 14 days, and added the target cpu runtime option of 2 days (Message 107626)
Posted 1 Nov 2022 by wiltonbro
Post:
I am finishing in 3 days. Just cuts down some other projects which have a longer deadline. I don't see any way to limit the number of rosetta jobs outside of changing the total run time available which affects all projects.
2) Message boards : Technical News : Due to user feedback and an attempt to reduce the load on our servers, we increased the default target run time from 3 to 6 hours, increased job deadlines to 14 days, and added the target cpu runtime option of 2 days (Message 107622)
Posted 1 Nov 2022 by wiltonbro
Post:
When is the deadline increase to 14 days scheduled?






©2024 University of Washington
https://www.bakerlab.org